18/05/2012   
 08:0016:0000:00Special demands
 EPUg 40 33 33.33
 EPUp 0 0 0
 U5 23.68 23.68 23.68
 U9 30 30 30
   
New message
Check OK
Not perform
Perform

 23:00
07:00
07:00
15:00
15:00
23:00
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Monday
 

  :No Message
  :Not Reply yet
  :Partial Reply
  :All Reply

Recent three days' operation record.

Tai-power voltage drop events occurred in 2007.
Liu, Yi-Chih
2008/01/18 11:10

加速器物理與科技簡介-04
Liu, Yi-Chih
2007/09/18 01:07

加速器物理與科技簡介-03
Liu, Yi-Chih
2007/09/18 01:07

加速器物理與科技簡介-02
Liu, Yi-Chih
2007/09/18 01:06

加速器物理與科技簡介-01
Liu, Yi-Chih
2007/09/18 01:05

Operation report from 0814 to 0820.
Liu, Yi-Chih
2007/08/22 08:27

Operation report from 0807 to 0813.
Liu, Yi-Chih
2007/08/22 08:26

Operation report from 0731 to 0806.
Liu, Yi-Chih
2007/08/22 08:26

Operation report from 0724 to 0730.
Liu, Yi-Chih
2007/08/22 08:25


Tai-power voltage drop events occurred in 2007. Liu, Yi-Chih 2008/01/18 11:10
File Shareing: 2008011823104832596年台電壓降事件整理表.xls
Related Link:
Voltage drop events occurred in 2007.

加速器物理與科技簡介-04 Liu, Yi-Chih 2007/09/18 01:07
File Shareing: 20070918130752841phys467500-04.pdf
Related Link:
2007 Fall semester Introduction to Accelerator Physics and Technology-04

PHYS467500
加速器物理與科技簡介-03 Liu, Yi-Chih 2007/09/18 01:07
File Shareing: 20070918130710541phys467500-03.pdf
Related Link:
2007 Fall semester Introduction to Accelerator Physics and Technology-03

PHYS467500
AprilMay 2012June
SunMonTueWedThuFriSat
 
1
 
 
2
 
 
3
 
 
4
 
 
5
 
 
6
 
 
7
 
 
8
 
 
9
 
 
10
 
 
11
 
 
12
 
 
13
 
 
14
 
 
15
 
 
16
 
 
17
 
 
18
 
 
19
 
 
20
 
 
21
 
 
22
 
 
23
 
 
24
 
 
25
 
 
26
 
 
27
 
 
28
 
 
29
 
 
30
 
 
31
 

Machine shutdown
Machine study
User time